linkedin 2 twitter 2

Ontario GO Transit Electrification Study

For Metrolinx, EDR Group, under subcontract to the ARUP/Delcan joint venture, conducted an economic impact analysis for electrifying GO Rail in Greater Toronto and Hamilton Area. Using TREDIS and conducting site visits and web research, EDR Group’s work included calculating the construction, operation, economic and land use impacts associated with the six electrification alternatives.

Electrification Study Webpage

Electrification Study Update Meeting-May, 2010

Economic Impacts Appendix-Decemeber 2010

Latest Blogposts

Twitter Feed (new)

RT @NASEMTRB: 2019 TRB Annual Meeting: Calls for Papers Now Open https://t.co/YEUqAqRAJa #TRBAM
Now available! - Investment Prioritization Methods for Low-Volume Roads | Blurbs New | Blurbs | Main -via @NASEMTRBhttps://t.co/s2589Afyht
Today at 1pm/3pm, EDR Group's Steve Landau is presenting on the FL Aviation Econ Impact Study at the Florida Econom… https://t.co/UGv0MLZCY9