Ontario GO Transit Electrification Study

For Metrolinx, EDR Group, under subcontract to the ARUP/Delcan joint venture, conducted an economic impact analysis for electrifying GO Rail in Greater Toronto and Hamilton Area. Using TREDIS and conducting site visits and web research, EDR Group’s work included calculating the construction, operation, economic and land use impacts associated with the six electrification alternatives.