linkedin 2 twitter 2

EDRG Awarded SHRP2 Project C32-Continuation of TPICS

The TPICS products, all developed by EDR Group for the SHRP2 program, consist of 100 before and after case studies, and a website (http://www.tpics.us/), used for searching and applying those case study findings to real-world planning and project evaluation.

EDR Group is the prime contractor on a team with ICF International and Susan Jones Moses & Associates, in preparing studies and materials designed to provide training in case study preparation at state DOTs and MPOs to supplement the current case studies in the TPICS web-based analysis system.  This project consists of six tasks:

•             Maintenance of the Existing TPICS Web Site

•             National Highway Institute Course on Economic Impact Analysis

•             Improvements to the TPICS User Interface and Internal Documentation

•             Development of a TPICS Forum/Discussion Community

•             Intake of New TPICS Case Studies

•             Incorporation of C11 Analysis Tools into TPICS

 

 

Latest Blogposts

Twitter Feed (new)

EDRG's Naomi Stein participated in the Southwestern Pennsylvania Commission’s first “Forces of Change Expert Resour… https://t.co/ecItWrY35Z
Benefit-Cost Analysis Guidance for Discretionary Grant Programs - US Department of Transportation https://t.co/d6mih6tMpU via @AddThis
The Evolution of Transportation + Economic Development: Ten Takeaways from I-TED 2018 https://t.co/p75Wd2nq0z @gweisbrod @NASEMTRB #I-TED