linkedin 2 twitter 2

EDRG Awarded SHRP2 Project C32-Continuation of TPICS

The TPICS products, all developed by EDR Group for the SHRP2 program, consist of 100 before and after case studies, and a website (http://www.tpics.us/), used for searching and applying those case study findings to real-world planning and project evaluation.

EDR Group is the prime contractor on a team with ICF International and Susan Jones Moses & Associates, in preparing studies and materials designed to provide training in case study preparation at state DOTs and MPOs to supplement the current case studies in the TPICS web-based analysis system.  This project consists of six tasks:

•             Maintenance of the Existing TPICS Web Site

•             National Highway Institute Course on Economic Impact Analysis

•             Improvements to the TPICS User Interface and Internal Documentation

•             Development of a TPICS Forum/Discussion Community

•             Intake of New TPICS Case Studies

•             Incorporation of C11 Analysis Tools into TPICS

 

 

Latest Blogposts

Twitter Feed

RT @TravisHalm: Today in the Omaha region, transit riders earn $71 million in wages, resulting in $206 million in regional sales and $117 m…
RT @city_viewer: EDR Group's recent study of the role of transportation investment in firm site selection decisions highlights concerns abo…
On 10/10, Mark Sieber will be presenting on highway infrastructure resilience at Transportation RISE in Denver, CO.… https://t.co/AmEbuUX8gP